Muh Rizki Ramadhani
Politeknik Perkeretaapian Indonesia Madiun
Handoko
Politeknik Perkeretaapian Indonesia Madiun
Erifendi Churniawan
Politeknik Perkeretaapian Indonesia Madiun
Keywords: Potential hazards, Risks, Daily inspection of South Sumatra LRT facilities, Work safety, HIRADC
ABSTRACT
Light Rail Transit South Sumatra was built on the basis of Presidential Regulation Number 55 of 2016 concerning the Acceleration of the Implementation of Light Railroad/Light Rail Transit in South Sumatra Province. To always maintain the reliability of the LRT facility, daily inspection work of the LRT facility is required which is carried out every day which has a potential risk of work accidents due to the use of equipment related to electricity and standard operating procedures (SOPs) that are not followed. This study aims to identify potential risks, determine the value of risks, arrange priority rankings, and analyze risk controls to reduce the impact of risks on the daily inspection work of the South Sumatra LRT facilities. This study conducted an analysis using the method hazard identification, risk assessment, and determining control (HIRADC). Based on the research, there are 18 risks with risk level classifications: 1 extreme risk, 7 high risk, 9 moderate risk, and 1 low risk. The determination of risk control is carried out according to the risk control hierarchy, namely engineering engineering, administrative control, and the use of personal protective equipment (PPE).
REFERENCES
-
PUBLISHED
2024-04-30
ISSUE
Vol. 2, No. 1 (2024)
PAGE
222-231
SECTION
Articles
LICENSE
Copyright © Berkala Forum Studi Transportasi antar Perguruan Tinggi
HOW TO CITE
Ramadhani, M. R., & Churniawan, E. (2024, April). Penerapan metode HIRADC dalam pengendalian risiko kecelakaan kerja pemeriksaan harian sarana LRT Sumatera Selatan. In Berkala Forum Studi Transportasi antar Perguruan Tinggi (Vol. 2, No. 1, pp. 222-231).